Design Day & Failing External CFDs: Minimizing Overbuild & Maximizing Infrastructure Utilization
- Examining assumptions and timing in the design day engineering approach to improve capacity planning accuracy and reduce overbuild while better aligning infrastructure design with real operational demand
- Exploring peak shaving strategies to reduce CAPEX, avoid utility oversubscription, and improve utilization of power and cooling infrastructure to optimise overall system efficiency and reduce unnecessary infrastructure build-out